How to maintain electroplating equipment daily
Time:2023-12-08

Electroplating equipment production lines occupy a large share in printed circuit board manufacturing enterprises. In order to ensure the normal operation of the electroplating equipment, the stability of the operation process and the service life of the electroplating equipment, the correct protection and maintenance of the equipment is very important. So, electroplating equipment manufacturers tell you why protection is important?

1. Protection and maintenance of the circulating system filter system 7d once check the filter element of the circulating system filter system to see if it leaks. Clean or replace the filter core every 10-15 days.

2. Protection of the linear plating line and protection of the linear plating line use brackets and expanders to transfer the substrate. Clean the crane and spanners once a week (do not remove the car and spanners), adhere to the clean appearance, clean with a rag, and sand with sandpaper.

3. Protection and maintenance of conveyors in horizontal electroplating production lines The conveying equipment used in horizontal electroplating production lines is the drum, which uses the rotation of the drum to continuously feed the circuit board into each slot. Therefore, the protection of the transport equipment of the horizontal hanging plating production line is different from that of the linear plating production line.

The drums of the horizontal plating line should be sorted once for 7 days to remove dirt adhering to the drums and ensure that the surface of the conveyor plate is clean. Check that the crankshaft is down.

4. The protection and maintenance of the vibration tissue on the linear electroplating production line should be carried out on the linear electroplating. In order to ensure the uniformity of the exterior copper and the effect of the hole copper during the copper plating process, the plate will vibrate and shake, and the tank will be set to vibrate and shake the structure. Check the reducer for 30 days to see if it works normally and check its tightness; Check the fastening of the bolts installed on the motor; Check the wear of anti-vibration rubber and replace it in time if it is serious. Check the contact of power cables in the 180d junction box. When the terminal is loose, tighten it immediately. For power cables with melted or aged insulation layers, replace the power cables to ensure insulation between them.

5. Protection and maintenance of other parts 7d. It is necessary to check the output power of the power supply twice; Check the heat dissipation devices and radiators commonly used in power supplies and electrical control devices, remove dust, and clean them to prevent heat dissipation. Check all connectors, timely repair poor contact, virtual connection and virtual welding, and timely replacement in case of corrosion damage; Check all contactors and relays. If the contact is poor or stuck, please replace it in time; Check the main parameters of capacitors, reactors, resistors and other parts. If abnormal, replace as soon as possible.

6. The main difference between the protection of the storage tank and the straight plating line and the horizontal plating line is that the method of transporting the circuit board is different. Tank protection and protection methods actually vary greatly. Within 7 days, each cleaning tank should be cleaned once, and the acid cleaning tank should be cleaned once, and then the tank liquid should be removed and replaced. Check whether the automatic water spraying device in the storage tank is blocked and pass the blockage immediately.

For the conductive support on the copper and tin plating solution and the contact between the anode and the induction power transmission line, wipe once with a towel and sandpaper. Check the titanium and tin baskets of the copper plating tank and tin plating tank, replace the rotten titanium basket bags and tin baskets, add the copper ball and tin rod, add the copper ball and tin rod after 7 days, electrolytic copper plating tank and electroplating tin bath.

主站蜘蛛池模板: 人人爽人妻精品A片二区 | 欧美6一9性sex娇小hd | 国产ts人妖思妮大街露出 | 激情综合网色播五月 | 日韩久久精品一区二区 | 日本一二三级 | 农村少妇真人毛片视频 | 国产成人精品福利色多多 | 免费xxxx视频 | 五月亚洲 | 阿hd中文字幕 | 国产精品国产三级国产专i 日本a天堂 | 日韩午夜伦伦午夜伦老司机 | 国产美女免费国产 | 男女操网站 | 少妇精品无码一区二区三区 | 最新谍战剧惊弦在线观看 | 欧美日韩久久久 | av手机版在线观看 | 看全色黄大色黄女片爽在线看 | 国产精品一级二级三级 | 又黄又湿又高潮网站 | 赤坂丽高校教师 | 无码人妻AⅤ一区二区三区麻豆 | 99久视频| 久久产精品一区二区三区污欧美 | 母亲4在线7观看完整免费 | 国产一级免费黄色片 | 99re66在线观看精品免费 | 精品国产乱码久久久久久密桃99 | 女性自慰网站免费看WW | 国产真实露脸乱子伦 | 国产日韩视频一区 | 暗呦交小u女国产精品视频 精品久久久久久久久久久下田 | 91porny丨首页| 男女互舔中出水抽插视频 | 美女久久久久久久久久 | 免费黄网站在线看 | h喷水荡肉失禁爽高h在线观看 | 国产3级在线观看 | 视频一区 视频二区 视频三区 视频四区 国产 |